Hi Sappers !!!
I am trying to make a cycle contains the following materials
A KMAT
A1 finished product variant
B KMAT
B1 Semifinished variant
C1 RAW MATERIAL
C2 RAW MATERIAL
I wanted to build the structure to fill the characteristics of the finished product and for subassembly if a variant is found the configurable semi finished B to be replaced by the variant B1 and if the configuration is not calling a variant the configurable subassembly B is choosen in configuration and Planned order is placed for the configurable finished order and finished subassembly.