Hi,
There is wrong information in my earlier post, due to some confusion. Multiple order generation is possible only if multiple maintenance items are involved.
Your strategy is non hierarchy, means 1M and 3M will have same hierarchy. .
I guess with your example 2 operations per package. When the first order is called with package 1M and 3M, one order is created with 4 operations. Second order is created only with maintenance package 1M, so only 2 operations are called.
To answer your request, you cannot control the maintenance planning based on the operation confirmation. System will generate based on the Order TECO status.
I hope this clarifies your query.
Regards
Terence