Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 2812

Assigning a Time Wage Type to a Work Schedule

$
0
0

Dear Experts;

 

I need your cooperation in something related to the time evaluation. I need to configure an overtime to start calculating the hours after 5:00 a.m. and multiply the rate by 1.35.

 

How can I assign that wage type to the work schedule and how can I set the conditions in table V_T510S

 

Weekdays   PH pre.day PH cur.day PH sub.day  Val.class   DWS class   Day type

 

As I can see at that customer he has different time wage types with different conditions, so how can I set my condition based on a specific work schedule.

 

Thanks in advance.

 

Best Regards;

Lobna


Viewing all articles
Browse latest Browse all 2812

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>