Re: material planning via Production version

$
0
0

1- How will I define 2 routings for a single material?  Is it by using Group in routings initial screen(ca01) ? How will I define that Group and assign it to the material?


Ans : As already explained By experts . It depends on that you are using alternately OR Qota Based. I would talk about if you use one routing alternately with the process of production Version. In Alternate Routing Group Remain same But Couter of group changes.

CA01>CREATE NEW1N.JPG

MAINTAIN USAGE 1 , STATUS 4

Click On "OPERATIONS"

2N.JPG

 

Click on opearion and maintain operation and control key .

As you can see i maintained route packing

3n.JPG

 

NOW MATERIAL HAVE TWO ROUTING WITH SAME GROUP AND DIFFERENT COUNTER.

NOW SET THIS ROUTE IN MATERIAL.

 

MM02>MRP4>PRODUCTION VERSION >NEW DETAIL

Final.JPG 

All field mention in Production version is important Like Basic data ,Planning data , Bill of materail.

 

Not as you can see ,In material ZFIN1 , Production version PV1 is active  which will futher trigger counter 2 or operation packing. So now when you will create production order system will trigger Counter 2 which is active. You can also mainatin production version through C223. Use Button check for any inconsistency . .check status should be in green.